Mining EquipmentContact

Jaw Crusher's Maintenance and Usage

timeJun 29,2011 E-mailsell@hxjq.com

1. Feeding equipment after normal running.

2. Material shall be fed evenly in order to prevent side load or side weight increase.

3. Generally, temperature rise o bearing shall not exceed 35℃ and maximum temperature shall not exceed 70 ℃, or stop and get rid of the trouble.

4. Stop feeding before stopping equipment, and cut motor after completely discharging materials in chamber. 

5. Cut motor immediately when equipment is stopped by materials block and restart the equipment after completely discharging materials in chamber.

6. Change the abraded end for the other end.

Prev : Mobile Crusher Introduction

Next : Optimized crusher selection for the cement industry

Get Price And Support

Please feel free to write down your requirement in the form below. We will reply you within 24 hours.

  • Product Name
  • Your Name
  • Your email*
  • Phone or Whatsapp
  • Enter the material to be processed, capacity, feeding size(mm), final product size(mm), or other needs.
Email sell@hxjq.com 24 hours online Chat Online

We will strictly protect the privacy of users'personal information and never disclose it.

Chat Online Leave Message

Hi, may I help you?

Return to the top